top of page

For the exclusive use of The Estate Companies. This information is privileged and must not be shared or used for any purpose other than the verification of documentation prior to the mobilization of subcontractors.

STATUS: 

APPROVED

LUMIX CONSTRUCTION CORP

SOLESTE PALM STATION - WPB

Mobilization Code:

4029751992

Section 1
Subcontractor general Information

Company:

LUMIX CONSTRUCTION CORP

POC Name:

Miguel Barcelo

POC Phone Number:

7864448241

POC Email:

Project:

SOLESTE PALM STATION - WPB

Scope of Work:

Water Distribution Systems

  • Install PVC, HDPE, DIP, or copper pipelines per design.
  • Install valves, fittings, fire hydrants, thrust blocks, and service connections.
  • Pressure test, disinfect, and flush lines.

Sanitary Sewer Systems

  • Install gravity sewer mains, laterals, and manholes.
  • Set grades to maintain proper flow and alignment.
  • Perform mandrel, air, or vacuum testing and CCTV inspections.

Storm Drainage Systems

  • Install reinforced concrete pipes (RCP), HDPE, or CMP as specified.
  • Install inlets, catch basins, junction boxes, and headwalls.
  • Ensure proper slope and alignment to designed flow direction.

Backfilling and Compaction

  • Backfill trenches in layers with approved materials.
  • Compact to required densities.
  • Install warning/marker tapes above utilities.
  • Restore surface finishes (asphalt, concrete).

Testing and Quality Control

  • Conduct pressure, leakage, deflection, and vacuum tests as applicable.
  • Record test results and submit to the project engineer.
  • Provide as-built drawings showing actual utility locations and depths.

Tools and Machinery

  • Excavator
  • Skid Steer
  • Gasoline Saw
  • Plate Compactor

Section 2
Contracted by:

The Estate Companies

Company Name

1

2

3

4

5

Section 3
Subcontractor - Subs Information:

Do you have subcontractors?

NO

Representative

Phone #

Email

Section 4
Required Documents:

Download the documents you need to verify.

COI Expiration Date:

March 31, 2026 at 11:00:00 PM

WOC Expiration Date:

June 28, 2026

Section 5
Responsible for Submitting the Information:

Jose Rivero

P.M

Signature:

istockphoto-1409329028-612x612.jpg

Created Date:

October 10, 2025 at 7:49:58 PM

Updated Date:

October 24, 2025 at 12:54:06 PM

Observations: